Load Forecasting

Modern Load Forecasting solution for a Dynamic Distribution Grid

Themis Load Forecasting delivers automated, explainable demand forecasts for utility operations and short-horizon planning - from hours ahead to days ahead

What is Themis Load Forecasting?

See what your grid will need next

Themis Load Forecasting is an automated forecasting solution predicting short-term and medium-term load demand for utility operations at defined grid points. Designed to achieve lower MAPE than conventional forecasting baselines used across ISO, RTO, and TSO environments.

Why Consider Themis Load Forecasting for your Utility?

Operational Intelligence Beyond the Forecast

01

Traditional forecasting tools were built for static conditions, not real-time operations where extreme weather and rapid topology changes can quickly shift system behaviour.

02

As bi-directional power flow becomes more common, operations teams need forecasts that are explainable and defensible, not just accurate.

03

Themis Load Forecasting is delivered through the Insights platform, where utilities can additionally review upcoming demand, compare forecasts with actuals, interact with agents and explore overall asset intelligence.

What can Utilities use Load Forecasting for?

Where load forecasting influences a utility's operational decisions

Peak-Day Readiness

Anticipate high-demand windows

Power Purchasing and Scheduling

Improve day-ahead and multi-day purchase schedules

Demand-Response Planning

More robust and accurate CVR and Demand-Response Planning

Operational Planning

Better operational and switching planning like planned maintenance, or load-transfer activities to customer demands

Weather-Driven Planning

Understand how heat waves, cold snaps, storms, etc may affect near-term demand.

DER and Net-Load Awareness

Account for the consumption patterns the utility must serve.

Telemetry-Degraded Operations

When real-time measurements are unavailable, delayed, or unreliable.

Core Capabilities of Themis Load Forecasting

Tools to Explore, Explain, and Apply Every Forecast

Forecasting Agent in Themis Insight
Weather and event overlays on a load forecast
Reporting Studio forecast report
Forecast explanation features
Integration and export options

Delivery Model

Themis Load Forecasting is delivered through the Themis Insight platform.

Cloud

An isolated, cloud-first environment with safe and secure access.

On-premise

Deployed inside the utility’s own infrastructure for advanced environments.

Hybrid

Cloud services combined with on-premises data residency where required.

FAQs

Frequently asked questions

Who is Load Forecasting designed for?

It is designed for utility operators, system planners, power-supply teams, analysts, engineers, and managers who need a reliable view of expected electricity demand.

What forecast horizons are available?

Themis supports short-term forecasting across contracted horizons, including day-ahead and week-ahead forecasts. Other horizons depend on the use case, available data, and agreed scope.

What data is needed to get started?

Utilities typically provide 2 years of historical hourly load or energy data, timestamps, forecast-point identifiers, and relevant asset or network mappings. Weather data and other contextual variables can then be added to improve the forecasting workflow.

Can forecasts be produced below the system level?

Yes. Forecasts can be produced at system, substation, or feeder level when the required historical data and network mappings are available and included in scope.

How does weather affect the forecast?

The models learn how demand responds to variables such as temperature, humidity, wind, cloud cover, and seasonal conditions. Forecast weather can then be used to estimate how near-term demand may change.

Does the solution show forecast uncertainty?

Yes. Confidence intervals can show a range of possible outcomes, helping teams understand risk rather than relying on a single point estimate.

Can users compare forecasts with actual load?

Yes. Actual load can be uploaded or ingested and displayed alongside the forecast for performance monitoring and analysis.

Can Load Forecasting integrate with existing systems?

Forecast data can be delivered through dashboards, exports, and scoped integration options. The exact connection depends on the utility’s systems and implementation requirements.

Does Load Forecasting replace SCADA or ADMS?

No. It works alongside existing operational systems and adds a forecasting layer that can support dashboards, planning processes, and selected operational workflows.

How is forecast accuracy measured?

Performance can be evaluated with standard metrics such as MAPE and MAE. Appropriate targets depend on forecast horizon, granularity, data quality, and the intended use case.

How does Themis Load Forecasting support human oversight?

The solution provides forecasts, uncertainty, and supporting context to inform decisions. Utility professionals remain responsible for reviewing results and deciding what action to take.

See what your grid will need next

Bring us a forecast that keeps missing and we will show you the range, the drivers, and what an operator would see.